“Measure the wobble first. Then pour the lead. A stoop rail is held by the pocket, not by paint.”— Lead ironworker on record, Cobblewrought
Fill three fields. Bring the street address. Note the rail side.
Step one — measure
We check every newel pocket by hand.
Play, rust, and stone cracks get written down.
Step two — strip
Old cement and crumbled lead come out.
The pocket is dried before any pour.
Step three — set
Molten lead is poured, then caulked tight.
Bent spindles are heated and pulled true.
Step four — close out
Iron is scaled, primed, and painted.
Leave the stoop clear while the rail cures.
> prices in USD. Measure first, then confirm.
Shop address
CobblewroughtFort Washington Avenue 99
10032 New York
United States
Phone and hours
Call on weekday mornings. Leave the address.
Site measures run on weekday afternoons.
Follow the bench
Before the crew arrives
Clear planters from the stoop.
Unlock the gate under the steps.
Keep pets inside during the pour.