Molten lead reset for loose newel post pocket
485 USD
The pocket is chipped clean and dried.
Lead is poured hot, then caulked to the stone.
On-site torch straightening of bent iron spindles
165 USD
Heat goes in at the bend, not the joint.
Bars are pulled true and re-seated.
Brownstone handrail re-anchoring into stone
Quote after measure
Spalled stone gets a sound anchor seat.
Mortar and sealant match the brownstone tone.
Rust scaling and repaint of cast iron rail
Quote after measure
Scale is wheeled off down to clean metal.
Primer first, then the finish coat.
Forged replacement of missing spindles
Quote after measure
Bar stock is forged to the old pattern.
New bars are set into the existing rail.
Order intake
Call 34669416418 with the street address.
Name the rail side and the loose part.
We schedule the measure, then the work day.